CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TANZA RIVER AND MALABON-NAVOTAS RIVER, MALABON CITY (PHASE 6)
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TANZA RIVER AND MALABON-NAVOTAS RIVER, MALABON CITY (PHASE 6) is a DPWH-tracked public work in Malabon-Navotas DEO, National Capital Region. Reported contract value: ₱58,009,333.82. Status: Past target date (DPWH On-Going). Contractor on record: ROTAFLEX CONST AND DEVELOPMENT CORP FORMERLY:ROTA FLEX CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
