FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD CONTROL SYSTEM, ALONG PINAMANCAAN RIVER, STA.0+050.00-STA.0+378.20 (DOWNSTREAM, LEFT SIDE), STA.0+050.00-STA.0+372.30 (DOWNSTREAM,
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD CONTROL SYSTEM, ALONG PINAMANCAAN RIVER, STA.0+050.00-STA.0+378.20 (DOWNSTREAM, LEFT SIDE), STA.0+050.00-STA.0+372.30 (DOWNSTREAM, is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱48,999,919.28. Status: Reported complete (DPWH). Contractor on record: A C RIVERO DEVELOPMENT CORP. Figures trace to dpwh.
Total Contract Cost
