Buildings and Facilities19CB0072

CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM AT BATAAN MNHS-CAMAYA CAMPUS, MARIVELES, BATAAN

CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM AT BATAAN MNHS-CAMAYA CAMPUS, MARIVELES, BATAAN is a DPWH-tracked public work in Bataan 2nd DEO, Region III. Reported contract value: ₱47,100,000.00. Status: Reported complete (DPWH). Contractor on record: B P CRUZ BUILDERS AND TRADING. Figures trace to dpwh.

Bataan 2nd DEO, Region III
Region: Region III

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-19-0014483

₱60,000.00 · FY2019

Released to Bata National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

35 projects · ₱1.3B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG); CONSTRUCTION/IMPROVEMENT/REHABILITATION OF MULTIPURPOSE BUILDING IN ANGELES CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2023₱72.4M
Reported complete (DPWH)
No sat.

Rehabilitation of Existing Dike along Lucung River (San Rafael Section, Right Bank), Sta. 8+585 to Sta. 8+985, Bamban, Tarlac

BAMBAN (TARLAC), TARLAC, Region III

2022₱57.7M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM; CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONST OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, BRGY PULUNG MARAGUL, ANGELES CITY, PAMPANGA-STA 1+800-STA 2+550

Pampanga 3rd DEO, Region III

2022₱55.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ZAMBALES NAVAL HOSPITAL, NAVAL STATION LEOVIGILDO GANTIOQUI (NSLG), SAN ANTONIO, ZAMBALES

Zambales 1st DEO, Region III

2022₱49.0M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM; CONST./REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRA INCLUDING LOCAL PROJECTS; FLOOD CONTROL AND DRAINAGE; DRAINAGE/SLOPE PROTECTION WORKS; CONST. OF SLOPE PROTECTION ALONG QUITANGIL CREEK, BRGY. LA PAZ TO BRGY SAN NICOLAS, MAGALANG,PAMPANGA

Pampanga 3rd DEO, Region III

2021₱49.0M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM;CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS;REHAB OF SLOPE PTOTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER,BRGY PANDAN TO BRGY CAPAYA, ANGELES CITY PAMPANGA

Pampanga 3rd DEO, Region III

2020₱48.9M
Reported complete (DPWH)
View all 35 projects →

4. Implementation

Contract Amount

₱47,100,000.00

Progress

Reported complete (DPWH)

Start Date

August 28, 2019

Target End

March 15, 2023

5. Audit