CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL, MATALAM, NORTH COTABATO STA. 28+500-STA. 28+900 L=400 LM RIGHT BANK
CONSTRUCTION OF KABACAN RIVER FLOOD CONTROL, MATALAM, NORTH COTABATO STA. 28+500-STA. 28+900 L=400 LM RIGHT BANK is a DPWH-tracked public work in Cotabato 2nd DEO, Region XII. Reported contract value: ₱24,499,000.00. Status: Reported complete (DPWH). Contractor on record: JARGON CONST. Figures trace to dpwh.
Total Contract Cost
