Flood Control and Drainage24CC0608

CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG BAGBAG CREEK BARANGAY PRITIL, GUIGUINTO, BULACAN (PACKAGE C)

CONSTRUCTION OF FLOOD MITIGATING STRUCTURE (CONCRETE SLOPE PROTECTION) ALONG BAGBAG CREEK BARANGAY PRITIL, GUIGUINTO, BULACAN (PACKAGE C) is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱92,638,586.98. Status: Past target date (DPWH On-Going). Contractor on record: JTC CRUZ CONST CO INC. Figures trace to dpwh.

Bulacan 1st DEO, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Probable match · score 88%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Bagbag Creek, Barangay Pritil, Guiguinto, Bulacan
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Bulacan 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

154 projects · ₱8.5B total · 5 flags

4. Implementation

Contract Amount

₱92,638,586.98

Progress

Past target date (DPWH On-Going)

Start Date

January 6, 2025

Target End

September 2, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.