ORG OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MGMT PROGM-CONST/ MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER,STA.1+173.60 - STA.1+492.40 (UPSTREAM R/S) AT BALAYAN,BATA
ORG OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MGMT PROGM-CONST/ MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER,STA.1+173.60 - STA.1+492.40 (UPSTREAM R/S) AT BALAYAN,BATA is a DPWH-tracked public work in Batangas 1st DEO, Region IV-A. Reported contract value: ₱86,850,000.00. Status: Reported complete (DPWH). Contractor on record: FRANDEL CONST AND DEVELOPMENT CORP. Figures trace to dpwh.
Total Contract Cost
