CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN BUED RIVER BASIN: ALONG BUED RIVER MAIN (RIVERSIDE CAMP 3), STA.042+430-STA.043+000, TUBA, BENGUET
CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN BUED RIVER BASIN: ALONG BUED RIVER MAIN (RIVERSIDE CAMP 3), STA.042+430-STA.043+000, TUBA, BENGUET is a DPWH-tracked public work in Benguet 1st DEO, Cordillera Administrative Region. Reported contract value: ₱26,657,315.01. Status: Reported complete (DPWH). Contractor on record: EAJR DE LEON CONST. Figures trace to dpwh.
Total Contract Cost
