CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CARMONA RIVER (UPSTREAM) AT BARANGAY LANTIC, CARMONA, CAVITE
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CARMONA RIVER (UPSTREAM) AT BARANGAY LANTIC, CARMONA, CAVITE is a DPWH-tracked public work in Cavite 3rd DEO, Region IV-A. Reported contract value: ₱47,530,071.55. Status: Past target date (DPWH On-Going). Contractor on record: TRISTAN TEJADA CONST FORMERLY: JOMATRIS CO. Figures trace to dpwh.
Total Contract Cost

