Roads21PB0008

ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, SECONDARY ROADS- CONNER-KABUGAO RD-K0597+625 -K0597+725, K0603+216 - K0603+266

ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, SECONDARY ROADS- CONNER-KABUGAO RD-K0597+625 -K0597+725, K0603+216 - K0603+266 is a DPWH-tracked public work in Apayao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱4,900,000.00. Status: Reported complete (DPWH). Contractor on record: PRIME MASTER CONST AND DEV'T CORP 43456. Figures trace to dpwh.

Apayao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Nabuangan River (Upstream) Flood Control, Sta. 37 + 807 - Sta. 38 + 267 (L/S), Sitio Paddig, Brgy. Caglayan, Conner, Apayao
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Apayao 1st DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

DPWH ID 43456

39 projects · ₱903.1M total · 0 flags

Other projects by this contractor

No sat.

NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS : PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD - PACKAGE 2 (CONSTRUCTION OF CONCRETE BRIDGE), APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2025₱141.7M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - CONSTRUCTION OF CONCRETE BRIDGE - SAN JOSE QUIBAL ROAD (BITAG-PEQUEÑO BR. 1), BAGGAO, CAGAYAN

Cagayan 1st DEO, Region II

2025₱98.3M
Ongoing (DPWH-reported)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - GUISING BR. (B01092LZ) ALONG MAHARLIKA HIGHWAY (CAGAYAN VALLEY RD)

Region II, Region II

2025₱67.5M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS / NEW ROADS ABRA-KALINGA-APAYAO ROAD (BULUAN-BANBAN-PUGUIN-SACPIL- PINUKPOK), PACKAGE 3, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2019₱56.3M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES, CONSTRUCTION OF CONCRETE BRIDGE - TALLANG BRIDGE 1 (PHASE II) ALONG BAYBAYOG-BAGGAO-DALIN-STA. MARGARITA RD, BAGGAO, CAGAYAN

Cagayan 1st DEO, Region II

2024₱48.9M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS - CONSTRUCTION OF ALANNAY FLOOD CONTROL STRUCTURE ALONG ZINUNDUNGAN RIVER, LAS

Cagayan 2nd DEO, Region II

2025₱48.9M
Past target date (DPWH On-Going)
View all 39 projects →

4. Implementation

Contract Amount

₱4,900,000.00

Progress

Reported complete (DPWH)

Start Date

February 8, 2021

Target End

August 9, 2021

5. Audit