FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVERBANK PROTECTION RETAINING WALL ALONG CALBASAG RIVER,BARANGAY HIGHWAY AND SAN RAFAEL,DULAG,LEYTE
FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVERBANK PROTECTION RETAINING WALL ALONG CALBASAG RIVER,BARANGAY HIGHWAY AND SAN RAFAEL,DULAG,LEYTE is a DPWH-tracked public work in Leyte 2nd DEO, Region VIII. Reported contract value: ₱86,415,804.07. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: LANOY CONST. Figures trace to dpwh.
Total Contract Cost


