LANOY CONST is listed as a company organization in Philippine public procurement records on this site, with 99 linked DPWH project(s) totaling about ₱4,609,844,630.27. Recorded delivery grade B (from public DPWH project records — not a finding of wrongdoing).
LANOY CONST
BGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 99
- Total value
- ₱4,609,844,630.27
- Published flags
- 6
- Region
- Leyte 2nd DEO · Region VIII
Online presence
Google Maps: Lanoy ConstructionGoogle Maps, 2026-10-22
QXRX+25W, Javier, Leyte
Licensed officers (PCAB)
- HANNAH MARIE O. LANOY · Authorized Managing Officer (PCAB license 35289) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for LANOY CONST — not an accusation or finding of wrongdoing.
Score: 88.60 / 100 · Projects in sample: 99 · As of Oct 28, 2026 UTC
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 80.3/100 · Weight: 47%
- graceDays
- 30
- componentScore
- 80.3
- lateCompletedProjects
- 5
- onTimeCompletedProjects
- 81
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 95
- pastTargetOngoingProjects
- 9
- undatedCompletedProjectsExcluded
- 4
- Termination rate
Component score: 100/100 · Weight: 21%
- totalProjects
- 99
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 21%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 99
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
Component score: 99.4/100 · Weight: 11%
- projects
- 99
- componentScore
- 99.4
- flagsPerProject
- 0.02
- publishedV2Flags
- 2
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 99
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 91 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BURAUEN BYPASS ROAD, LEYTE22I00052 · ₱139,249,980.93 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DAGUITAN - MARABONG RIVER, BARANGAY SABANG, DULAG, LEYTE24I00118 · ₱139,174,414.79 · mapped
- Construction of Carigara Tide Embankment, Carigara, Leyte23I00014 · ₱123,519,982.60 · mapped
- NETWORK DEVELOPMENT -PAVING OF UNPAVED ROADS-TERTIARY ROADS,BURAUEN-MAHAGNAO RD.-K0989+000-K0989+195, K0991+763-K0993+42519ID0043 · ₱96,492,916.64 · mapped
- Construction of Shore Protection, Old Road, Phase 2, Tacloban City23IM0048 · ₱96,280,895.96 · mapped
- CONSTRUCTION OF MALITBOGAY FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, DAGUITAN RIVER BASIN, MALITBOGAY, BURAUEN, LEYTE22I00047 · ₱96,170,645.44 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BURAUEN BYPASS ROAD, PACKAGE 1, LEYTE24I00005 · ₱94,262,056.51 · mapped
- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO CALUMPIJAN ISLAND AND COASTAL ROAD DIVING SPOT, CAPOOCAN, LEYTE22I00049 · ₱92,781,717.66 · mapped
- Construction of Carigara Tide Embankment, Sta. 0+150-Sta.0+283, Carigara, Leyte21I00015 · ₱92,505,676.69 · mapped
- Construction of Storm Surge Protection; Tide Embankment, Subsection 6.13, Barangay Sto Niño, Tanauan, Leyte23I00027 · ₱89,542,656.00 · mapped
- CONSTRUCTION OF CARIGARA TIDE EMBANKMENT, STA. 0+000 - STA. 0+150, CARIGARA, LEYTE20I00012 · ₱88,898,567.01 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVERBANK PROTECTION RETAINING WALL ALONG CALBASAG RIVER,BARANGAY HIGHWAY AND SAN RAFAEL,DULAG,LEYTE24ID0078 · ₱86,415,804.07 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAPOOCAN-LEYTE, LEYTE COASTAL ROAD, LEYTE24I00114 · ₱72,600,382.87 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - ABUYOG-SILAGO ROAD - K0987+106-K0987+332, K0987+351-K0988+425, K0988+451-K0989+60419IG0056 · ₱72,375,000.00 · mapped
- NETWORK DEVELOPMENT - CONSTRUCTION OF BYPASS AND DIVERSION ROADS - BURAUEN BYPASS ROAD, LEYTE, LEYTE 2ND LD23I00003 · ₱72,199,629.15 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF DAGUITAN FLOOD CONTROL STRUCTURES ,DAGUITAN RIVER BASIN(DOWNSTREAM),BURAUEN,LEYTE24ID0028 · ₱69,489,921.78 · mapped
- REPAIR/REHABILITATION/IMPROVEMENT OF ROAD SLIPPED/SHOULDER SLIPPED ALONG DAANG MAHARLIKA, K0862+750, BRGY. LAYGAYUN, PINABACDAO, SAMAR19I00143 · ₱67,873,763.42 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BINAHAAN FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, BINAHAAN RIVER BASIN, BARANGAY SAN BENITO - BARANGAY LOS MARTIRES - BARANGAY DIGAHONGAN, DAGAMI, LEYTE21I00047 · ₱67,499,261.70 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BINAHAAN FLOOD CONTROL STRUCTURE BINAHAAN RIVER BASIN,PASTRANA,LEYTE24ID0034 · ₱66,889,671.57 · mapped
- Construction of Spur Dikes along Daguitan-Marabong River, Daguitan-Marabong River Basin, Barangay Batug, Dulag, Leyte23ID0055 · ₱63,371,976.78 · mapped
- CONSTRUCTION/EXTENSION OF DUNGCA-AN FLOOD CONTROL STRUCTURES AND DRAINAGE SYSTEM (DUNGCA-AN RIVER BASIN), BAYBAY CITY, LEYTE18IG0067 · ₱57,900,000.00 · mapped
- Construction of Flood Control System, Phase II, Sta. 00+000 - Sta. 0+439, Barangay Astorga, Tunga, Leyte24ID0035 · ₱57,899,999.79 · mapped
- CONSTRUCTION OF MARAO FLOOD CONTROL STRUCTURES, MARAO RIVER BASIN, STA. 000+150 - STA. 000+395 (RIGHT SIDE RIVER BANK), INOPACAN, LEYTE19I00114 · ₱56,148,222.02 · mapped
- Construction of Naliwatan Flood Control Structure and drainage system, Naliwatan River Basin, Barangay San Vicente, Tunga, Leyte23ID0039 · ₱55,480,232.43 · mapped
- Construction of Daguitan Flood Control Structure and Drainage system, Daguitan River Basin (Downstream), Burauen, Leyte23ID0032 · ₱55,280,408.90 · mapped
- Construction of Tunga Flood Control Structure and Drainage system, Tunga River Basin, Barangay Astorga, Tunga, Leyte23ID0054 · ₱55,209,715.80 · mapped
- CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG IBAWON RIVER, MAC ARTHUR, LEYTE20I00013 · ₱53,167,426.43 · mapped
- Construction of Bito Flood Control Structure, Barangay Picas Norte, Javier, Leyte23IG0032 · ₱52,485,867.50 · mapped
- CONSTRUCTION OF SLOPE PROTECTION ALONG CAPOOCAN COASTAL ROAD,CAPOOCAN,LEYTE21ID0077 · ₱49,498,371.94 · mapped
- CONSTRUCTION OF ACCESS ROAD LEADING TO INAYUPAN PEAK, LEYTE24IG0027 · ₱49,296,985.92 · mapped
- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BAYBAY CITY DIVERSION ROAD, BAYBAY CITY, LEYTE19IG0003 · ₱49,000,000.00 · mapped
- Construction of Binahaan Flood Control Structure and Drainage System, Binahaan River Basin, Sta. 0+000 - Sta. 0+500, Brgy. Digahungan, Dagami, Leyte22ID0053 · ₱48,999,996.54 · mapped
- Construction of Binahaan Bank Protection Structure and Drainage system, Binahaan River Basin, Brgy. Cansamada East, Dagami, Leyte22ID0056 · ₱48,999,893.55 · mapped
- ACCESS ROAD LEADING TO CALUMPIJAN ISLAND AND COASTAL ROAD DIVING SPOT,CAPOOCAN,LEYTE20ID0040 · ₱48,999,605.73 · mapped
- CONSTRUCTION OF BINAHAAN FLOOD CONTROL STRUCTURE & DRAINAGE SYSTEM, BINAHAAN RIVER BASIN, K000+850 - K001+513.25 (RIGHT SIDE RIVER BANK), PASTRANA, LEYTE21ID0059 · ₱48,999,321.31 · mapped
- Construction of Ibawon Flood Control Structure and Drainage System, Ibawon River Basin, Sta. 0+000 - Sta. 0+400 (Upstream), Brgy. Burabod, MacArthur, Leyte22ID0032 · ₱48,992,529.60 · mapped
- Construction of Binahaan Flood Control Structure and Drainage System, Binahaan River Basin, Sta. 0+000 - Sta. 0+350 (Downstream), Brgy. Balilit, Dagami, Leyte22ID0030 · ₱48,991,679.56 · mapped
- Construction of Binahaan Flood Control Structure and Drainage System, Binahaan River Basin, Sta. 0+160 - Sta. 0+460 (Upstream), Brgy. Balilit, Dagami, Leyte22ID0038 · ₱48,991,275.51 · mapped
- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DAGUITAN FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM,DAGUITAN RIVER BASIN,BURAUEN,LEYTE21ID0036 · ₱48,986,088.14 · mapped
- NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING-TERTIARY ROADS JARO-DAGAMI-BURAUEN-LA PAZ RD. K0983+150-K0984+56022ID0050 · ₱48,986,048.47 · mapped
- Construction of Shoreline Protection, Brgy. Mawodpawod, San Miguel, Leyte23IC0035 · ₱48,949,999.55 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF SEAWALL,BRGY. SAN JOSE-BRGY. SAN RAFAEL,DULAG,LEYTE18ID0065 · ₱48,736,958.57 · mapped
- CONSTRUCTION OF 4-STOREY 20-CLASSROOM SCHOOL BUILDING GRACE PARK ES (MAIN), CALOOCAN CITY19OD0286 · ₱48,647,782.55 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BINAHAAN FLOOD CONTROL STRUCTURE,BINAHAAN RIVER BASIN, BARANGAY CANSAMADA EAST,DAGAMI,LEYTE24ID0053 · ₱48,509,888.23 · mapped
- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BINAHAAN FLOOD CONTROL STRUCTURE BINAHAAN RIVER BASIN(UPSTREAM),BRGY. ABRE,DAGAMI,LEYTE24ID0040 · ₱48,509,529.46 · mapped
- ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROAD BURAUEN-MAHAGNAO ROAD, K 0988+300 - K 0988+69621ID0063 · ₱48,019,850.98 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROAD BURAUEN-MAHAGNAO ROAD K 0988+200-K 0988+39021ID0074 · ₱48,014,823.46 · mapped
- NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-ABUYOG BY-PASS ROAD,LEYTE22IG0017 · ₱47,942,496.60 · mapped
- FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS -CONSTRUCTION OF BINAHAAN FLOOD CONTROL STRUCTURE, BINAHAAN RIVER BASIN,BARANGAY SAN BENITO, BRGY. SAN BENITO, DAGAMI,LEYTE24ID0069 · ₱47,769,499.77 · mapped
- CONSTRUCTION OF MARAO FLOOD CONTROL STRUCTURES, MARAO RIVER BASIN, STA. 0+395 - STA. 0+403 AND STA. 0+409 - STA. 0+601 (RIGHT SIDE RIVER BANK), INOPACAN, LEYTE20I00009 · ₱47,688,254.69 · mapped
Equipment & capacity
PCAB license
- License no.
- 35289
- Category
- A · Medium B
- Minimum net worth for this category
- ₱30,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱300M
- License valid until
- Jul 25, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 35289); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
19 evaluations listed across 6 GPPB CPES releases; average final rating 89.8% over 4 rated projects; 18 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Mar 22, 2025 | DPWH | ₱72,600,382.00 | On-going | 91.3% | — | 39th (rev), p. 121 |
| Nov 4, 2024 | DPWH | ₱66,889,672.00 | On-going | 86.5% | — | 39th (rev), p. 121 |
| Nov 4, 2024 | DPWH | ₱47,482,176.00 | Completed | 98.9% | 86.8% | 39th (rev), p. 121 |
| Nov 4, 2024 | DPWH | ₱49,296,986.00 | On-going | 94.2% | — | 39th (rev), p. 121 |
| Jul 31, 2024 | DPWH (JV) | ₱48,509,529.00 | On-going | 88.1% | — | 38th, p. 139 |
| Jul 31, 2024 | DPWH | ₱139,174,415.00 | On-going | 89.0% | — | 38th, p. 138 |
| Jul 25, 2024 | DPWH | ₱47,482,176.00 | On-going | 78.8% | — | 38th, p. 138 |
| Apr 16, 2024 | DPWH (JV) | ₱175,261,945.00 | On-going | 93.2% | — | 38th, p. 138 |
| Nov 23, 2023 | DPWH | ₱44,988,000.00 | Completed | 91.7% | 90.5% | 37th, p. 62 |
| Aug 23, 2023 | DPWH | ₱44,988,000.00 | On-going | 88.5% | — | 36th, p. 121 |
| Jun 27, 2023 | DPWH | ₱44,988,000.00 | On-going | 91.0% | — | 36th, p. 121 |
| Jun 21, 2023 | DPWH | ₱48,991,276.00 | Final | 93.3% | 92.3% | 36th, p. 121 |
Showing the 12 most recent of 19.
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →