CONSTRUCTION OF BINAHAAN FLOOD CONTROL STRUCTURE & DRAINAGE SYSTEM, BINAHAAN RIVER BASIN, K000+850 - K001+513.25 (RIGHT SIDE RIVER BANK), PASTRANA, LEYTE
CONSTRUCTION OF BINAHAAN FLOOD CONTROL STRUCTURE & DRAINAGE SYSTEM, BINAHAAN RIVER BASIN, K000+850 - K001+513.25 (RIGHT SIDE RIVER BANK), PASTRANA, LEYTE is a DPWH-tracked public work in Leyte 2nd DEO, Region VIII. Reported contract value: ₱48,999,321.31. Status: Reported complete (DPWH). Contractor on record: LANOY CONST. Figures trace to dpwh.
Total Contract Cost


