Flood Control and Drainage20BB0084

LOCAL PROGRAM-FLOOD CONTL & DRAINAGE - FLD CONT'L STRUCTURES/FACILITIES-CONST./REPAIR/REHAB. OF VARIOUS INFRASTRUCTURE INCL. LOCAL - CONST.OF FLD MITIGATION STRUCTURE ALONG APAGONAN RIVER AND ITS CONFLUENCE ALONG CAGAYAN RIVER (PHASE 6), APARRI, CAGAYAN

LOCAL PROGRAM-FLOOD CONTL & DRAINAGE - FLD CONT'L STRUCTURES/FACILITIES-CONST./REPAIR/REHAB. OF VARIOUS INFRASTRUCTURE INCL. LOCAL - CONST.OF FLD MITIGATION STRUCTURE ALONG APAGONAN RIVER AND ITS CONFLUENCE ALONG CAGAYAN RIVER (PHASE 6), APARRI, CAGAYAN is a DPWH-tracked public work in Cagayan 1st DEO, Region II. Reported contract value: ₱18,990,534.70. Status: Reported complete (DPWH). Contractor on record: PERRC INC FORMERLY: P E R R C CONST. Figures trace to dpwh.

Cagayan 1st DEO, Region II
Region: Region II

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Appagonan River and its confluence along Cagayan River (Phase 6), Aparri, Cagayan
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Cagayan 1st DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

20BB0084 - Local Program – Flood Control and Dra

₱18,990,534.70 · P.E.R.R.C. CONSTRUCTION & DEVELOPMENT

Contractor

43 projects · ₱2.5B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRASTRUCTURE PROJS. ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL RDS. &/OR BRS. (OR,RDS. THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONST. OF BYPASS RD. (PHASE 8) AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE

Region III, Region III

2024₱283.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL RDS. &/OR BRS. (OR,RDS. THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONST. OF BYPASS RD. AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE CITY (PHASE 9), B

Region III, Region III

2024₱193.0M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS & BRIDGES-LOCAL ROADS-CONSTRUCTION OF BYPASS ROAD AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE, PROVINCE OF BULACAN

Region III, Region III

2021₱188.0M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE STRUCTURES & OTHER ANCILLARY WORKS, KO139+800-KO141+891

Region IV-B, Region IV-B

2018₱144.8M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE & OTHER ANCILLARY WORKS, KO226+400-KO226+537; KO226+562-KO228+954, BATARAZA, PALAWAN

Region IV-B, Region IV-B

2018₱144.8M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) TO SIX (6) LANES INCL DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS K0175+627-K0176+185; K0176+194-K0177+880, BROOKE'S POINT, PALAWAN

Region IV-B, Region IV-B

2018₱135.1M
Reported complete (DPWH)
View all 43 projects →

4. Implementation

Contract Amount

₱18,990,534.70

Progress

Reported complete (DPWH)

Start Date

November 18, 2020

Target End

July 16, 2021

5. Audit