GAA 2024 SSP24C00306

CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL RDS. &/OR BRS. (OR,RDS. THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONST. OF BYPASS RD. AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE CITY (PHASE 9), B

CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL RDS. &/OR BRS. (OR,RDS. THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONST. OF BYPASS RD. AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE CITY (PHASE 9), B is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱192,982,918.23. Status: Past target date (DPWH On-Going). Contractor on record: PERRC INC FORMERLY: P E R R C CONST. Figures trace to dpwh.

Region III, Region III
Region: Region III

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

43 projects · ₱2.5B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRASTRUCTURE PROJS. ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL RDS. &/OR BRS. (OR,RDS. THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONST. OF BYPASS RD. (PHASE 8) AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE

Region III, Region III

2024₱283.7M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS & BRIDGES-LOCAL ROADS-CONSTRUCTION OF BYPASS ROAD AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE, PROVINCE OF BULACAN

Region III, Region III

2021₱188.0M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE & OTHER ANCILLARY WORKS, KO226+400-KO226+537; KO226+562-KO228+954, BATARAZA, PALAWAN

Region IV-B, Region IV-B

2018₱144.8M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE STRUCTURES & OTHER ANCILLARY WORKS, KO139+800-KO141+891

Region IV-B, Region IV-B

2018₱144.8M
Reported complete (DPWH)
No sat.

WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM TWO (2) TO SIX (6) LANES INCL DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS K0175+627-K0176+185; K0176+194-K0177+880, BROOKE'S POINT, PALAWAN

Region IV-B, Region IV-B

2018₱135.1M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, CONSTRUCTION/INSTALLATION OF STREET LIGHTS ALONG CALAGUIMAN-VICINAL ROAD (SO1286LZ), (SO1287LZ), PROVINCE OF BATAAN

Region III, Region III

2021₱131.2M
Reported complete (DPWH)
View all 43 projects →

4. Implementation

Contract Amount

₱192,982,918.23

Progress

Past target date (DPWH On-Going)

Start Date

May 20, 2024

Target End

December 3, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.