Construction of Flood Control Structure at Caguray River Poclolo Section, Magsaysay, Occidental Mindoro
Construction of Flood Control Structure at Caguray River Poclolo Section, Magsaysay, Occidental Mindoro is a DPWH-tracked public work in MAGSAYSAY (DAVAO DEL SUR), DAVAO DEL SUR, Region IV-B. Reported contract value: ₱39,192,528.61. Status: Reported complete (DPWH). Contractor on record: F A TORRES CONST / BLACER CONST CORP. Figures trace to sumbong.
Total Contract Cost
