FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG MAASIM RIVER, PUROK 1, BRGY CASALAT, SAN ILDEFONSO, BULACAN (SEGMENT A)
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF RIVER SLOPE PROTECTION ALONG MAASIM RIVER, PUROK 1, BRGY CASALAT, SAN ILDEFONSO, BULACAN (SEGMENT A) is a DPWH-tracked public work in Bulacan 3rd DEO, Region III. Reported contract value: ₱95,062,138.26. Status: Past target date (DPWH On-Going). Contractor on record: 11-16 CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

