CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TABANG RIVER AT BARANGAY SAN NICOLAS, BULAKAN, BULACAN
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TABANG RIVER AT BARANGAY SAN NICOLAS, BULAKAN, BULACAN is a DPWH-tracked public work in Bulacan 1st DEO, Region III. Reported contract value: ₱69,951,052.68. Status: Past target date (DPWH On-Going). Contractor on record: PTM DEVELOPMENT CORP. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
