Construction of Flood Mitigation Structure along Barit River (Upstream), Left Side Phase II, Brgy. San Jose, Nabua, Camarines Sur
Construction of Flood Mitigation Structure along Barit River (Upstream), Left Side Phase II, Brgy. San Jose, Nabua, Camarines Sur is a DPWH-tracked public work in NABUA (CAMARINES SUR), CAMARINES SUR, Region V. Reported contract value: ₱77,096,696.93. Status: Reported complete (DPWH). Contractor on record: BICOL GOLDROCK CONST CORP / ASCON CONST AND SUPPLY. Figures trace to sumbong.
Total Contract Cost
