Construction of Slope Protection along Camiling River (Left Bank), Pindangan 1st - Pindangan 2nd Section (Package D), Camiling, Tarlac
Construction of Slope Protection along Camiling River (Left Bank), Pindangan 1st - Pindangan 2nd Section (Package D), Camiling, Tarlac is a DPWH-tracked public work in CAMILING (TARLAC), TARLAC, Region III. Reported contract value: ₱48,511,637.23. Status: Reported complete (DPWH). Contractor on record: HIGH STRENGTH DEV CORP / RCUBE ENGINEERING SERVICES. Figures trace to sumbong.
Total Contract Cost
