STRENGTHENING OF RIGHT SIDE EXISTING BANK OF SAN PEDRO SECTION ALONG PARUA RIVER, UPSTREAM OF SCTEX BRIDGE, BAMBAN, TARLAC (PART A)
STRENGTHENING OF RIGHT SIDE EXISTING BANK OF SAN PEDRO SECTION ALONG PARUA RIVER, UPSTREAM OF SCTEX BRIDGE, BAMBAN, TARLAC (PART A) is a DPWH-tracked public work in Tarlac 2nd DEO, Region III. Reported contract value: ₱69,299,089.24. Status: Past target date (DPWH On-Going). Contractor on record: WRO CONST CORP. Figures trace to dpwh.
Total Contract Cost

