CONSTRUCTION OF FLOOD CONTROL STRUCTURE FROM ALUBIJID RIVER/ BCIR, BOTH SIDES, ALONG ALUBIJID RIVER, ALUBIJID, MISAMIS ORIENTAL
CONSTRUCTION OF FLOOD CONTROL STRUCTURE FROM ALUBIJID RIVER/BCIR, BOTH SIDES, ALONG ALUBIJID RIVER, ALUBIJID, MISAMIS ORIENTAL is a DPWH-tracked public work in Region X, Region X. Reported contract value: ₱154,191,000.34. Status: Reported complete (DPWH). Contractor on record: EQUI-PARCO CONST CO. Figures trace to dpwh.
Total Contract Cost

