Roads21DD0001

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/ REHABILITATION OF ROAD INCLUDING DRAINAGE SYSTEM AT BARANGAY SAN GUILLERMO, LIPA CITY, BATANGAS

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/ REHABILITATION OF ROAD INCLUDING DRAINAGE SYSTEM AT BARANGAY SAN GUILLERMO, LIPA CITY, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱9,701,487.00. Status: Reported complete (DPWH). Contractor on record: TONIJON CONST AND DEVELOPMENT INC FORMERLY: TONIJON CONST. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱29,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Lawaye River, Barangay Palahanan 2.0, San Juan, Batangas
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Batangas 4th DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

101 projects · ₱661.0M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINAGBAYANAN, TAYSAN, BATA

Batangas 4th DEO, Region IV-A

2024₱29.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

Construction of Flood Control Structure, Paninsingin Bridge, Rosario, Batangas

ROSARIO (BATANGAS), BATANGAS, Region IV-A

2023₱29.4M
Reported complete (DPWH)
No sat.

Construction of Flood Control Structure, Pinagsibaan Bridge 2, Rosario, Batangas

ROSARIO (BATANGAS), BATANGAS, Region IV-A

2023₱29.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAHANADIONG BRIDGE, TAYSAN

Batangas 4th DEO, Region IV-A

2024₱29.4M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF - CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, SN JUAN-LAIYA RD - K0151 + 510 - K0151 + 808, K0151 + 815 - K0152 + 940

Batangas 4th DEO, Region IV-A

2022₱22.3M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF ROAD WITH LINE CANAL AT BRGY. CAWONGAN AND POBLACION, PADRE GARCIA, BATANGAS

Batangas 4th DEO, Region IV-A

2019₱19.0M
Reported complete (DPWH)
View all 101 projects →

4. Implementation

Contract Amount

₱9,701,487.00

Progress

Reported complete (DPWH)

Start Date

February 10, 2021

Target End

April 22, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.