Construction of Barren River (Downstream) Flood Control along Chico River Basin, Sta. 37 + 414 - Sta. 37 + 664 (R/S), Barangay Paddaoan, Conner, Apayao
Construction of Barren River (Downstream) Flood Control along Chico River Basin, Sta. 37 + 414 - Sta. 37 + 664 (R/S), Barangay Paddaoan, Conner, Apayao is a DPWH-tracked public work in CONNER (APAYAO), APAYAO, Cordillera Administrative Region. Reported contract value: ₱24,500,000.00. Status: Reported complete (DPWH). Contractor on record: GKA ENGINEERING AND CONST. Figures trace to sumbong.
Total Contract Cost