Buildings and Facilities18CI0092

COMPLETE CONSTRUCTION OF 4-STOREY 20 CLASSROOM SCHOOL BULDING, SAPANG BATO NATIONAL HIGH SCHOOL, ANGELES CITY

COMPLETE CONSTRUCTION OF 4-STOREY 20 CLASSROOM SCHOOL BULDING, SAPANG BATO NATIONAL HIGH SCHOOL, ANGELES CITY is a DPWH-tracked public work in Pampanga 3rd DEO, Region III. Reported contract value: ₱41,121,229.31. Status: Reported complete (DPWH). Contractor on record: B P CRUZ BUILDERS AND TRADING. Figures trace to dpwh.

Pampanga 3rd DEO, Region III
Region: Region III

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Reinforced Concrete Slope Protection with Steel Sheet Piles Foundation along Abacan River, Barangay Malabanias, Angeles City, Pampanga
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-18-0008955

₱0.00 · FY2018

Released to Division of Pampanga (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

35 projects · ₱1.3B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG); CONSTRUCTION/IMPROVEMENT/REHABILITATION OF MULTIPURPOSE BUILDING IN ANGELES CITY, PAMPANGA

Pampanga 3rd DEO, Region III

2023₱72.4M
Reported complete (DPWH)
No sat.

Rehabilitation of Existing Dike along Lucung River (San Rafael Section, Right Bank), Sta. 8+585 to Sta. 8+985, Bamban, Tarlac

BAMBAN (TARLAC), TARLAC, Region III

2022₱57.7M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM; CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONST OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, BRGY PULUNG MARAGUL, ANGELES CITY, PAMPANGA-STA 1+800-STA 2+550

Pampanga 3rd DEO, Region III

2022₱55.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ZAMBALES NAVAL HOSPITAL, NAVAL STATION LEOVIGILDO GANTIOQUI (NSLG), SAN ANTONIO, ZAMBALES

Zambales 1st DEO, Region III

2022₱49.0M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM; CONST./REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRA INCLUDING LOCAL PROJECTS; FLOOD CONTROL AND DRAINAGE; DRAINAGE/SLOPE PROTECTION WORKS; CONST. OF SLOPE PROTECTION ALONG QUITANGIL CREEK, BRGY. LA PAZ TO BRGY SAN NICOLAS, MAGALANG,PAMPANGA

Pampanga 3rd DEO, Region III

2021₱49.0M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM;CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS;REHAB OF SLOPE PTOTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER,BRGY PANDAN TO BRGY CAPAYA, ANGELES CITY PAMPANGA

Pampanga 3rd DEO, Region III

2020₱48.9M
Reported complete (DPWH)
View all 35 projects →

4. Implementation

Contract Amount

₱41,121,229.31

Progress

Reported complete (DPWH)

Start Date

June 25, 2018

Target End

March 8, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.