CLUSTER VIII-FY 2022: (1)REHABILITATION OF SAN RAFAEL FLOOD CONTROL STRUCTURE (IRAYA SECTION), GUINOBATAN, ALBAY; (2) CONSTRUCTION OF MANINILA RIVER (BRGY. MANINILA-BRGY.MASARAWAG) FLOOD MITIGATION SYSTEM, GUINOBATAN, ALBAY
CLUSTER VIII-FY 2022: (1)REHABILITATION OF SAN RAFAEL FLOOD CONTROL STRUCTURE (IRAYA SECTION), GUINOBATAN, ALBAY; (2) CONSTRUCTION OF MANINILA RIVER (BRGY. MANINILA-BRGY.MASARAWAG) FLOOD MITIGATION SYSTEM, GUINOBATAN, ALBAY is a DPWH-tracked public work in Albay 3rd DEO, Region V. Reported contract value: ₱85,377,470.30. Status: Past target date (DPWH On-Going). Contractor on record: RCDS CONST. Figures trace to dpwh.