RCDS CONST is listed as a company organization in Philippine public procurement records on this site, with 60 linked DPWH project(s) totaling about ₱3,192,133,658.77. Recorded delivery grade D (from public DPWH project records — not a finding of wrongdoing).
RCDS CONST
DGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 60
- Total value
- ₱3,192,133,658.77
- Published flags
- 0
- Region
- Albay 3rd DEO · Region V
Public Record Grade
A transparent, data-derived summary of reported public records for RCDS CONST — not an accusation or finding of wrongdoing.
Score: 65.30 / 100 · Projects in sample: 60 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 32.7/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 32.7
- lateCompletedProjects
- 1
- onTimeCompletedProjects
- 26
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 54
- pastTargetOngoingProjects
- 27
- undatedCompletedProjectsExcluded
- 6
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 60
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 60
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 60
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 60
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 45 of 54 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (DOWNSTREAM OF BRIDGE) PACKAG25FO0047 · ₱141,131,714.05 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CABILOGAN FLOOD MITIGATION STRUCTURE, BARANGAY PANDAN24FO0066 · ₱140,583,604.08 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF PINAMANIQUIAN-PANDAN-TASTAS FLOOD CONTROL IN LIGAO CITY, ALBAY23FO0098 · ₱140,407,702.87 · mapped
- LOCAL PROGRAM-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION OF BONGA FLOOD CONTROL (UPSTREAM OF SPILLWAY), BONGA, LEGAZPI CITY,20F00097 · ₱101,324,075.83 · mapped
- CONSTRUCTION/EXTENSION OF BAYBAY SEAWALL, MALINAO, ALBAY20FA0009 · ₱96,500,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE, BARANGAY NABONTON, LIGAO CITY, A24FO0111 · ₱96,227,672.78 · mapped
- CLUSTER IX-2022: (1) CONSTRUCTION OF SAN FRANCISCO RIVER FLOOD MITIGATION STRUCTURE, BRGY. MORERA AND BRGY. SAN RAFAEL, GUINOBATAN, ALBAY; (2) CONSTRUCTION OF MULADBUCAD FLOOD CONTROL DIKE IN MULADBUCAD, GUINOBATAN, ALBAY22FO0094 · ₱94,864,089.62 · mapped
- CLUSTER VII-2022: 1.) CONSTRUCTION OF SAN FRANCISCO RIVER FLOOD MITIGATION STRUCTURE, BRGY. MAGUIRON, GUINOBATAN, ALBAY, AND 2.) CONSTRUCTION OF SAN FRANCISCO RIVER FLOOD MITIGATION STRUCTURES (BRGY. MAGUIRON AND BRGY. MINTO), GUINOBATAN, ALBAY22FO0072 · ₱94,863,340.99 · mapped
- OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CAMARINES SUR-ALBAY DIVERSION ROAD (ALBAY SECTION),INCLUDING ROW, ALBAY18F00101 · ₱94,455,840.61 · mapped
- OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM TRIBUTARIES TO YAWA RIVER24FB0271 · ₱93,603,730.20 · mapped
- CLUSTER 13-REHAB./RECONSTRUCTION/UPGRADING/WIDENING OF ROADS, DRAINAGE AND ROADS WITH SLOPE COLLAPSE ALONG NATIONAL ROADS IN THE FIRST DISTRICT OF ALBAY19FA0019 · ₱85,726,480.00 · mapped
- CLUSTER VIII-FY 2022: (1)REHABILITATION OF SAN RAFAEL FLOOD CONTROL STRUCTURE (IRAYA SECTION), GUINOBATAN, ALBAY; (2) CONSTRUCTION OF MANINILA RIVER (BRGY. MANINILA-BRGY.MASARAWAG) FLOOD MITIGATION SYSTEM, GUINOBATAN, ALBAY22FO0092 · ₱85,377,470.30 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE OF SAN RAFAEL RIVER CONTROL, GUINOBATAN, ALBAY20FO0041 · ₱84,765,600.00 · mapped
- CLUSTER XVIII-ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-XVIII-I: DAANG MAHARLIKA (LZ)-K0503+522-K0504+231, K0507+780-K05024F00345 · ₱80,914,757.83 · mapped
- CLUSTER 34-REHABILITATION/RECONSTRUCTION OF FLOOD CONTROL PROJECTS DAMAGED BY TYPHOON NINA ANG SUPER TYPHOON LAWIN AT SAN ANTONIO RIVER CONTROL, TABACO CITY AND BAGUMBAYAN SITIO LUBAS RIVER CONTROL, MALINAO, ALBAY17FA0061 · ₱77,803,098.89
- RREHABILITATION/IMPROVEMENT OF DIARO FLOOD CONTROL, MALINAO, ALBAY20FA0038 · ₱77,200,000.00 · mapped
- REHAB./IMPROVEMENT OF BULAWAN FLOOD CONTROL RIGHT SIDE OF BULAWAN BRIDGE FACING DOWNSTREAM, MALILIPOT, ALBAY20FA0036 · ₱77,200,000.00 · mapped
- MFO1-ROAD WIDENING WITH DRAINAGE-PRIMARY ROADS: DAANG MAHARLIKA (LZ) K0488+400-K0500+700,00 WITH EXCEPTIONS, ALBAY PROVINCE, ALBAY 3RD LD17F00029 · ₱72,947,331.85 · mapped
- CLUSTER VIII-2023: (1) CONSTRUCTION OF ROAD, BAGACAY - VILLA PAZ, JOVELLAR, ALBAY; (2) CONSTRUCTION OF ROAD, BANAWAN, PIODURAN, ALBAY; (3) CONSTRUCTION OF ROAD, CATOMAG, GUINOBATAN, ALBAY; (4) CONSTRUCTION OF ROAD, MAIPON-INASCAN, GUINOBATAN, ALBAY; (5) C23FO0017 · ₱72,182,215.77 · mapped
- CONSTRUCTION/EXTENSION OF BUANG RIVER CONTROL, BRGY. BUANG (PHASE II), TABACO CITY, ALBAY19FA0017 · ₱57,900,000.00 · mapped
- CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE (BRGY. NASISI AND BRGY. BASAG), LIGAO CITY, ALBAY22FO0028 · ₱56,047,152.16 · mapped
- SIPAG- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF BUSAY FLOOD CONTROL SYSTEM INCLUDING ESPLANADE ALONG BUSAY RIVER (MAIN), DARAGA, ALBAY22FB0113 · ₱56,045,551.90 · mapped
- ORGANIZATIONAL OUTCOME 1 - ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS -CAMARINES SUR - ALBAY DIVERSION ROAD, PACKAGE 6, ALBAY24FO0013 · ₱55,322,874.99 · mapped
- REHABILITATION OF LABNIG FLOOD CONTROL PHASE 1, MALINAO, ALBAY20FA0022 · ₱54,450,000.00 · mapped
- SIPAG: CONSTRUCTION OF MAYON-SAN RAMON ROAD INCLUDING DRAINAGE SYSTEM, DARAGA, ALBAY22FB0157 · ₱52,175,211.23 · mapped
- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BAGUMBAYAN-KIWALO-GABAWAN ROAD INCLUDING BRIDGE, DARAGA, ALBAY22FB0223 · ₱51,907,591.32 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TALISAY RIVER FLOOD MITIGATION STRUCTURE, BRGY SAN JUAN AND BRGY PISTOLA,25FO0060 · ₱48,114,209.01
- SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - REHABILITATION OF TUMPA FLOOD CONTROL DIKE IN CAMALIG, ALBAY22FB0078 · ₱47,429,913.77 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NASISI/TOBGON RIVER, LEF25FO0027 · ₱47,043,749.68 · mapped
- CLUSTER 2- REHABILITATION/EXTENSION/IMPROVEMENT OF OGOB RIVER CONTROL AND BULANG RIVER CONTROL, MALINAO, ALBAY19FA0022 · ₱47,040,000.00 · mapped
- ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TRAVESIA - TANDARORA - MANINILA FLOOD CONTROL DIKE, GUI25FO0025 · ₱47,029,378.26 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, LIGAO - TABACO RD. KO503+050 - KO503+69023FO0025 · ₱46,790,251.50 · mapped
- SIPAG: CONSTRUCTION OF GUADALUPE-CAROGCOG INTERIOR ROAD PHASE 2, RAPU-RAPU, ALBAY23FB0165 · ₱46,276,740.83 · mapped
- CLUSTER 1 CONSTRUCTION OF MALILIPOT FLOOD CONTROL, BULAWAN SECTION, SAN JOSE, MALILIPOT, ALBAY AND REPAIR/REHABILITATION OF SAN VICENTE RIVER CONTROL, TABACO CITY, ALBAY17FA0007 · ₱45,025,315.30
- CONST. OF FLOOD CONTROL STRUCTURE ALONG CADAC-AN RIVER, BRGY. SAN PEDRO, IROSIN, SORSOGON, IROSIN, S17FL0039 · ₱41,991,811.40 · mapped
- REHABILITATION/IMPROVEMENT OF TANDARORA FLOOD CONTROL DIKE (LEFT SIDE), GUINOBATAN, ALBAY21FO0005 · ₱40,180,000.00 · mapped
- REHABILITATION/IMPROVEMENT OF TANDARORA FLOOD CONTROL DIKE (RIGHT SIDE), GUINOBATAN, ALBAY21FO0044 · ₱40,180,000.00 · mapped
- CLUSTER XIII-2018: REHABILITATION OF TALONGOG-BUSAC FLOOD CONTROL STRUCTURE & CABILOGAN RIVER CONTROL STRUCTURE, BONGA SECTION18FO0038 · ₱39,840,828.17 · mapped
- CLUSTER 1-CONSTRUCTION/REHAB./IMPROVEMENT OF FLOOD CONTROL AT FIDEL SURTIDA AND LIDONG (UPSTREAM OF BASUD BRIDGE), STO. DOMINGO, ALBAY19FA0021 · ₱39,200,000.00 · mapped
- CONSTRUCTION OF AGOS RIVER BATO LAKE FLOOD CONTROL, BATO SECTION, BATO, CAMARINES SURSTA. 0+680 STA. 0+90420FN0016 · ₱39,199,950.41 · mapped
- REHABILITATION/IMPROVEMENT OF TANDARORA FLOOD CONTROL STRUCTURE, GUINOBATAN, ALBAY21FO0102 · ₱38,220,000.00 · mapped
- CONSTRUCTION/REHABILITATION OF BRGY. BALZA RIVER CONTROL ( DOWNSTREAM) ALONG QUINALE RIVER, MALINAO, ALBAY 1ST LD17FA0003 · ₱37,628,589.66 · mapped
- CONSTRUCTION/EXTENSION OF FLOOD MITIGATION ALONG MAJOR RIVER BASINS ( LAKE BICOL) BRGY. BUANG, TABACO CITY, ALBAY17FA0008 · ₱34,300,000.00
- SIPAG: CONSTRUCTION OF ANISLAG-MAOPI-SAN RAMON ROAD PHASE II, DARAGA, ALBAY23FB0053 · ₱33,094,044.58 · mapped
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG MANINILA RIVER (BARANGAY MANINILA - BARANGAY MASARAWAG), GUINOBATAN, ALBAY21FO0008 · ₱30,380,000.00 · mapped
- CONSTRUCTION OF LIGAO FLOOD CONTROL, BINATAGAN SECTION, STA. 0+000 - STA. 0+55417FO0026 · ₱28,949,861.77
- CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION/ENHANCEMENT OF RIVER BANK PROTECTION (ROAD DIKE) ALONG HOMAPON RIVER, LEGAZPI CITY21FB0109 · ₱19,597,980.72 · mapped
- PREVENTIVE MAINTENANCE - ASSET PRESERVATION, ALBAY WEST COAST ROAD, K0496+271 - K0498+000 & K0500+1001 - K0501+49618FO0001 · ₱19,040,562.49 · mapped
- K0502+114-K0503+752.31 (PAULOG SECTION ASPHALT OVERLAY), LIGAO CITY19FO0113 · ₱19,007,979.74 · mapped
- CONSTRUCTION/IMPROVEMENT OF CABILOGAN RIVER COURSE (KINALE SECTION)18FO0025 · ₱18,953,563.19 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →