CLUSTER VII-2022: 1.) CONSTRUCTION OF SAN FRANCISCO RIVER FLOOD MITIGATION STRUCTURE, BRGY. MAGUIRON, GUINOBATAN, ALBAY, AND 2.) CONSTRUCTION OF SAN FRANCISCO RIVER FLOOD MITIGATION STRUCTURES (BRGY. MAGUIRON AND BRGY. MINTO), GUINOBATAN, ALBAY
CLUSTER VII-2022: 1.) CONSTRUCTION OF SAN FRANCISCO RIVER FLOOD MITIGATION STRUCTURE, BRGY. MAGUIRON, GUINOBATAN, ALBAY, AND 2.) CONSTRUCTION OF SAN FRANCISCO RIVER FLOOD MITIGATION STRUCTURES (BRGY. MAGUIRON AND BRGY. MINTO), GUINOBATAN, ALBAY is a DPWH-tracked public work in Albay 3rd DEO, Region V. Reported contract value: ₱94,863,340.99. Status: Past target date (DPWH On-Going). Contractor on record: RCDS CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost