Roads19FO0113

K0502+114-K0503+752.31 (PAULOG SECTION ASPHALT OVERLAY), LIGAO CITY

K0502+114-K0503+752.31 (PAULOG SECTION ASPHALT OVERLAY), LIGAO CITY is a DPWH-tracked public work in Albay 3rd DEO, Region V. Reported contract value: ₱19,007,979.74. Status: Reported complete (DPWH). Contractor on record: RCDS CONST. Figures trace to dpwh.

Albay 3rd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROV-19-0012920 · ₱80,500 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19FO0113 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-01-08 → 2022-04-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: K0502+114-K0503+752.31 (PAULOG SECTION ASPHALT OVERLAY), LIGAO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROV-19-0012920

₱80,500.00 · FY2019

Released to Pili National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

60 projects · ₱3.2B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (DOWNSTREAM OF BRIDGE) PACKAG

Albay 3rd DEO, Region V

2025₱141.1M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CABILOGAN FLOOD MITIGATION STRUCTURE, BARANGAY PANDAN

Albay 3rd DEO, Region V

2024₱140.6M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF PINAMANIQUIAN-PANDAN-TASTAS FLOOD CONTROL IN LIGAO CITY, ALBAY

Albay 3rd DEO, Region V

2023₱140.4M
Past target date (DPWH On-Going)

LOCAL PROGRAM-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION OF BONGA FLOOD CONTROL (UPSTREAM OF SPILLWAY), BONGA, LEGAZPI CITY,

Region V, Region V

2020₱101.3M
Reported complete (DPWH)

CONSTRUCTION/EXTENSION OF BAYBAY SEAWALL, MALINAO, ALBAY

Albay 1st DEO, Region V

2020₱96.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE, BARANGAY NABONTON, LIGAO CITY, A

Albay 3rd DEO, Region V

2024₱96.2M
Past target date (DPWH On-Going)
View all 60 projects →

4. Implementation

Contract Amount

₱19,007,979.74

Progress

Reported complete (DPWH)

Start Date

July 31, 2019

Target End

September 28, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCity of LigaoPaulog
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.