GAA 2017 MFO-217PC0008

CONSTRUCTION/MANAGEMENT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF RIVER CONTROL/PROTECTION, EAST APAYAO-ABULUG IRRIGATION SYSTEMS APAYAO

CONSTRUCTION/MANAGEMENT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF RIVER CONTROL/PROTECTION, EAST APAYAO-ABULUG IRRIGATION SYSTEMS APAYAO is a DPWH-tracked public work in Apayao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱74,449,851.49. Status: Reported complete (DPWH). Contractor on record: ASC CONST. Figures trace to dpwh.

Apayao 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 74%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control and Drainage System of Daraga Poblacion, Daraga, Albay
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0001304

₱350,000.00 · FY2017

Released to Taft National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

67 projects · ₱2.3B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM, PAVING OF UNPAVED-TERTIARY ROADS

Apayao 1st DEO, Cordillera Administrative Region

2024₱106.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF SLOPE PROTECTION ALONG CALOG CREEK(TRIBUTARY OF APAYAO-ABULUG RIVER BASIN), BRGY CAPAGA

Apayao 2nd DEO, Cordillera Administrative Region

2024₱96.5M
Past target date (DPWH On-Going)

CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, STA. 20+135-STA. 20 +613(L/S), STA. MARCELA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2021₱96.5M
Reported complete (DPWH)

CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER BASIN, BAROCBOC-SAN MARIANO, STA. MARCELA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2023₱96.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS-ADAMS (ILOCOS NORTE)-CALANASAN (APAYAO) ROAD, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2021₱96.4M
Reported complete (DPWH)

CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER (STA 0+000-STA0+500), BAROCBOC, STA. MARCELA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2019₱93.6M
Reported complete (DPWH)
View all 67 projects →

4. Implementation

Contract Amount

₱74,449,851.49

Progress

Reported complete (DPWH)

Start Date

April 10, 2017

Target End

December 25, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.