SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF FLOOD CONTROL ALONG MOBOD CREEK (PROPER LANGCANGAN - LOWER LAMAC - UPPER LOBOC - CANUBAY
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF FLOOD CONTROL ALONG MOBOD CREEK (PROPER LANGCANGAN - LOWER LAMAC - UPPER LOBOC - CANUBAY is a DPWH-tracked public work in Misamis Occidental 1st DEO, Region X. Reported contract value: ₱39,199,932.47. Status: Past target date (DPWH On-Going). Contractor on record: MINDANAO ROCK. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost
