GAA 2025 OO-125PC0014

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0645+000 - K0645+243.5

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - KABUGAO-PUDTOL-LUNA-CAGAYAN BDRY RD - K0645+000 - K0645+243.5 is a DPWH-tracked public work in Apayao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱29,432,917.76. Status: Past target date (DPWH On-Going). Contractor on record: ASC CONST. Figures trace to dpwh.

Apayao 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Apayao-Abulug River Basin, Tanglagan Section, Sta. 163 + 101 - Sta. 163 + 551 (L/S) and Sta. 163 + 101- Sta. 163 + 601 (R/S), Calanasan, Apayao
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Apayao 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

67 projects · ₱2.3B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM, PAVING OF UNPAVED-TERTIARY ROADS

Apayao 1st DEO, Cordillera Administrative Region

2024₱106.6M
Reported complete (100% progress, DPWH status On-Going)
No sat.

OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF SLOPE PROTECTION ALONG CALOG CREEK(TRIBUTARY OF APAYAO-ABULUG RIVER BASIN), BRGY CAPAGA

Apayao 2nd DEO, Cordillera Administrative Region

2024₱96.5M
Past target date (DPWH On-Going)

CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, STA. 20+135-STA. 20 +613(L/S), STA. MARCELA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2021₱96.5M
Reported complete (DPWH)

CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER BASIN, BAROCBOC-SAN MARIANO, STA. MARCELA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2023₱96.5M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS-ADAMS (ILOCOS NORTE)-CALANASAN (APAYAO) ROAD, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2021₱96.4M
Reported complete (DPWH)

CONSTRUCTION OF BAROCBOC FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER (STA 0+000-STA0+500), BAROCBOC, STA. MARCELA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2019₱93.6M
Reported complete (DPWH)
View all 67 projects →

4. Implementation

Contract Amount

₱29,432,917.76

Progress

Past target date (DPWH On-Going)

Start Date

April 3, 2025

Target End

November 28, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.