Construction of Flood Control Structure, Brgy. Lobbot, Dipaculao, Aurora
Construction of Flood Control Structure, Brgy. Lobbot, Dipaculao, Aurora is a DPWH-tracked public work in DIPACULAO (AURORA), AURORA, Region III. Reported contract value: ₱19,600,000.00. Status: Reported complete (DPWH). Contractor on record: R N G M CONST CORP FORMERLY: R N G M CONST. Figures trace to sumbong.
Total Contract Cost
