Construction of Flood Control Structures Along Camiling River Left Bank, Bacabac Section (Phase IV-2), Camiling, Tarlac
Construction of Flood Control Structures Along Camiling River Left Bank, Bacabac Section (Phase IV-2), Camiling, Tarlac is a DPWH-tracked public work in CAMILING (TARLAC), TARLAC, Region III. Reported contract value: ₱28,767,900.51. Status: Reported complete (DPWH). Contractor on record: GJE BUILDERS CORP FORMERLY: GJE BUILDERS. Figures trace to sumbong.
Total Contract Cost
