CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IBULAO RIVER, STA. 325+444 - STA. 325+685 AND STA. 332+180 - K0332+350, HAPID, LAMUT, IFUGAO
CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IBULAO RIVER, STA. 325+444 - STA. 325+685 AND STA. 332+180 - K0332+350, HAPID, LAMUT, IFUGAO is a DPWH-tracked public work in Ifugao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱29,359,456.88. Status: Past target date (DPWH On-Going). Contractor on record: BEGAL DESIGN. Figures trace to dpwh.
Total Contract Cost
