Construction of Flood Control Structure along Bislak River, Barangay Cabaruan, Bacarra, Ilocos Norte
Construction of Flood Control Structure along Bislak River, Barangay Cabaruan, Bacarra, Ilocos Norte is a DPWH-tracked public work in BACARRA (ILOCOS NORTE), ILOCOS NORTE, Region I. Reported contract value: ₱29,399,734.00. Status: Reported complete (DPWH). Contractor on record: BJMJB CONST & SUPPLY. Figures trace to sumbong.
Total Contract Cost
