CONSTRUCTION OF RIVER BANK PROTECTION STRUCTURE ALONG TIBSOK RIVER CHANNEL, STA. 0+400 - STA. 0+800 (LEFT SIDE) (SECTION II), SAN ENRIQUE, NEGROS OCCIDENTAL
CONSTRUCTION OF RIVER BANK PROTECTION STRUCTURE ALONG TIBSOK RIVER CHANNEL, STA. 0+400 - STA. 0+800 (LEFT SIDE) (SECTION II), SAN ENRIQUE, NEGROS OCCIDENTAL is a DPWH-tracked public work in Negros Occidental 4th DEO, Negros Island Region. Reported contract value: ₱45,078,264.57. Status: Reported complete (DPWH). Contractor on record: JAIME B CHING ENT. Figures trace to dpwh.
Total Contract Cost
