CONST./EXTENSION OF FLOOD CONTROL STRUCTURE ALONG TUCDAO RIVER (PHASE 4) PROTECTING TUCDAO BRIDGE & BILIRAN CIRCUMFERENTIAL ROAD (11.6978, 124.4639), KAWAYAN, PROVINCE OF BILIRAN
CONST./EXTENSION OF FLOOD CONTROL STRUCTURE ALONG TUCDAO RIVER (PHASE 4) PROTECTING TUCDAO BRIDGE & BILIRAN CIRCUMFERENTIAL ROAD (11.6978, 124.4639), KAWAYAN, PROVINCE OF BILIRAN is a DPWH-tracked public work in Biliran DEO, Region VIII. Reported contract value: ₱18,550,000.00. Status: Reported complete (DPWH). Contractor on record: B M MARKETING. Figures trace to dpwh.
Total Contract Cost
