CONSTRUCTION OF CONCRETE REVETMENT (RC CUT-OFF WALL), SANGHAY, MALITA, DAVAO OCCIDENTALSTA. 0 + 340- STA. 0 + 507.03 - BOTHSIDES (UPSTREAM); STA. 0 + 524.14 - STA. 0 + 740.00 - RIGHT SIDE (DOWNSTREAM); STA. 0 + 524.14 - STA. 0 + 840.00 - LEFT SIDE (D
CONSTRUCTION OF CONCRETE REVETMENT (RC CUT-OFF WALL), SANGHAY, MALITA, DAVAO OCCIDENTALSTA. 0 + 340- STA. 0 + 507.03 - BOTHSIDES (UPSTREAM); STA. 0 + 524.14 - STA. 0 + 740.00 - RIGHT SIDE (DOWNSTREAM); STA. 0 + 524.14 - STA. 0 + 840.00 - LEFT SIDE (D is a DPWH-tracked public work in Davao Occidental DEO, Region XI. Reported contract value: ₱28,352,099.25. Status: Reported complete (DPWH). Contractor on record: ST TIMOTHY CONST CORP. Figures trace to dpwh.
Total Contract Cost