Roads24C00504

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF ROADS, BRGY. CAMBIO, SAN MIGUEL, BULACAN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF ROADS, BRGY. CAMBIO, SAN MIGUEL, BULACAN is a DPWH-tracked public work in Region III, Region III. Reported contract value: ₱4,873,043.95. Status: Past target date (DPWH On-Going). Contractor on record: ADSL CONST. Figures trace to dpwh.

Region III, Region III
Region: Region III

Money Trail

1. Appropriation

No GAA appropriation line matched for this project at current confidence thresholds.

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

101 projects · ₱5.0B total · 0 flags

Other projects by this contractor

No sat.

CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, BRGY. MULAWIN-BRGY. GENERAL ESCO, NAUJAN, OR. MINDORO

Region IV-B, Region IV-B

2025₱137.9M
Past target date (DPWH On-Going)
No sat.

CONST./MAINT. OF FLOOD MITIGATION SRTRUCTURES AND DRAINAGE SYSTEM- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PJHASE 2, BRGY. MULAWIMN, NAUJAN, ORINTAL MINORO

Region IV-B, Region IV-B

2025₱137.9M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 2, SAN MIGUEL, BULACAN

Bulacan 3rd DEO, Region III

2025₱133.7M
Past target date (DPWH On-Going)
No sat.

ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- ASPHALT OVERLAY INCLUDING ROAD SAFETY DEVICES ALONG SN MIGUEL- SIBUL RD NETWORK, PHASE 1, SAN MIGUEL, BULACAN

Bulacan 3rd DEO, Region III

2025₱133.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG ANYATAM-MAPANIQUE CREEK, PHASE 6, SAN ILDEFON

Region III, Region III

2024₱133.0M
Ongoing (DPWH-reported)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCT. ALONG ANYATAM-MAPANIQUE CREEK, PHASE 7, SAN ILDEFON

Region III, Region III

2024₱128.3M
Ongoing (DPWH-reported)
View all 101 projects →

4. Implementation

Contract Amount

₱4,873,043.95

Progress

Past target date (DPWH On-Going)

Start Date

December 23, 2024

Target End

February 20, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.