Roads20PB0028

CONCRETING OF BRGY. CAGLAYAN TO BRGY. MACATEL FMR, BRGY. CAGLAYAN AND BRGY. MACATEL, CONNER, APAYAO

CONCRETING OF BRGY. CAGLAYAN TO BRGY. MACATEL FMR, BRGY. CAGLAYAN AND BRGY. MACATEL, CONNER, APAYAO is a DPWH-tracked public work in Apayao 1st DEO, Cordillera Administrative Region. Reported contract value: ₱11,351,919.41. Status: Reported complete (DPWH). Contractor on record: BAHRAMLEY CONST 42050. Figures trace to dpwh.

Apayao 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

No GAA appropriation line matched for this project at current confidence thresholds.

2. Allotment

No SARO/NCA release rows linked to this project yet. See DBM release listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

Not graded

DPWH ID 42050

30 projects · ₱328.1M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF DALIMUNO, BANTAY FLOOD CONTROL ALONG CHICO RIVER (STA. 100+023 - STA. 100+430), BANTAY, TABUK CITY, KALINGA

Cordillera Administrative Region, Cordillera Administrative Region

2024₱96.5M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM(BIP)- ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF ROAD, BRGY. CAGLAYAN-MAUBBA TO MAKATEL, CONNER, APAYAO

Apayao 1st DEO, Cordillera Administrative Region

2023₱49.5M
Reported complete (DPWH)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF MASABLANG-RAGAS-CALLUGAYAN ROAD, BARANGAY MASABLANG, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2022₱24.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF TOMIANGAN FLOOD CONTROL, DUPAG, TABUK CITY, KALINGA

Upper Kalinga DEO, Cordillera Administrative Region

2020₱24.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD, KATAO LACNOG TO ANUNANG, LIWAN WEST, RIZAL ROAD, LACNOG, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2019₱19.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF DUPAG PROPER FLOOD CONTROL ALONG CHICO RIVER, BRGY. DUPAG, TABUK CITY, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2019₱17.5M
Reported complete (DPWH)
View all 30 projects →

4. Implementation

Contract Amount

₱11,351,919.41

Progress

Reported complete (DPWH)

Start Date

July 27, 2020

Target End

November 7, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.