FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCURES AND DRAINAGE SYSTEM REHABILITATION/ IMPROVEMENT OF LUMBANG RIVER CONTROL, STA.4+107 - STA.4+205 (UPSTREAM, RIGHT SIDE), STA.4+107 - STA.4+205 (UPSTREAM, LEFT SIDE), MASBATE C
FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCURES AND DRAINAGE SYSTEM REHABILITATION/IMPROVEMENT OF LUMBANG RIVER CONTROL, STA.4+107 - STA.4+205 (UPSTREAM, RIGHT SIDE), STA.4+107 - STA.4+205 (UPSTREAM, LEFT SIDE), MASBATE C is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱18,862,010.09. Status: Reported complete (DPWH). Contractor on record: HKP CONST AND SUPPLY. Figures trace to dpwh.
Total Contract Cost
