STRENGTHENING/ARMORING OF EXISTING EARTH DIKE ALONG LUCUNG RIVER (CUT-CUT 1ST SECTION, LEFT BANK), D/S OF CUT-CUT BRIDGE, CAPAS, TARLAC
STRENGTHENING/ARMORING OF EXISTING EARTH DIKE ALONG LUCUNG RIVER (CUT-CUT 1ST SECTION, LEFT BANK), D/S OF CUT-CUT BRIDGE, CAPAS, TARLAC is a DPWH-tracked public work in Tarlac 2nd DEO, Region III. Reported contract value: ₱46,719,836.38. Status: Reported complete (DPWH). Contractor on record: B K SY TU CONST 12655. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost