B K SY TU CONST is listed as a company organization in Philippine public procurement records on this site, with 90 linked DPWH project(s) totaling about ₱1,376,601,190.31. Recorded delivery grade A (from public DPWH project records — not a finding of wrongdoing).
B K SY TU CONST
AGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 90
- Total value
- ₱1,376,601,190.31
- Published flags
- 0
- Region
- Tarlac 2nd DEO · Region III
Public Record Grade
A transparent, data-derived summary of reported public records for B K SY TU CONST — not an accusation or finding of wrongdoing.
Score: 95.70 / 100 · Projects in sample: 90 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 97.2/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 97.2
- lateCompletedProjects
- 5
- onTimeCompletedProjects
- 85
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 90
- pastTargetOngoingProjects
- 0
- undatedCompletedProjectsExcluded
- 0
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 90
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 90
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 90
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 90
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 35 of 67 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- CONSTRUCTION OF 2 STOREY 18 CLASSROOMS L-TYPE SCHOOL BLDG., GERONA NORTH CES, GERONA, TARLAC19CJ0177 · ₱53,335,378.80 · mapped
- REPAIR/REHABILITATION/RESTORATION OF DAMAGED SLOPE PROTECTION ALONG PARUA RIVER (BANGCU SECTION, BAMBAN, TARLAC), BAMBAN, TARLAC18CK0155 · ₱50,605,540.68 · mapped
- REHABILITATION OF EXISTING DIKE ALONG O'DONNELL RIVER (PATLING SECTION, RIGHT SIDE), CAPAS, TARLAC20CK0002 · ₱47,002,033.80 · mapped
- REHABILITATION OF EXISTING DIKE ALONG O'DONNELL RIVER (MARUGLO SECTION, RIGHT SIDE), CAPAS, TARLAC20CK0001 · ₱46,979,308.89 · mapped
- REHABILITATION/IMPROVEMENT OF EXISTING EARTH DIKE ALONG RIO CHICO RIVER (LOMBOY SECTION, RIGHT BANK), U/S OF RIO CHICO BRIDGE, LA PAZ, TARLAC20CK0031 · ₱46,955,559.90 · mapped
- STRENGTHENING/ARMORING OF EXISTING EARTH DIKE ALONG LUCUNG RIVER (CUT-CUT 1ST SECTION, LEFT BANK), D/S OF CUT-CUT BRIDGE, CAPAS, TARLAC20CK0037 · ₱46,719,836.38 · mapped
- REHABILITATION/IMPROVEMENT OF EXISTING EARTH DIKE ALONG RIO CHICO RIVER (LOMBOY SECTION, RIGHT BANK), U/S OF RIO CHICO BRIDGE, LA PAZ, TARLAC20CK0030 · ₱40,717,370.51 · mapped
- REHABILITATION OF EXISTING DIKE ALONG O'DONNELL RIVER (MARUGLU SECTION, RIGHT BANK), CAPAS, TARLAC20CK0033 · ₱38,653,298.81 · mapped
- REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG RIO CHICO RIVER (MATAYUMTAYUM SECTION), R/B, LA PAZ, TARLAC19CK0068 · ₱37,220,684.93 · mapped
- REHAB/IMPT OF EXISTING DIKE ALONG LUCUNG RIVER (MAGAO SAECTION), CONCEPCION, TARLAC18CK0012 · ₱32,580,943.54 · mapped
- CONSTRUCTION OF FOUR (4) STOREY, TWENTY (20) CLASSROOM SB AT EDUARDO COJUANGCO NVHS, PANIQUI, TARLAC16CJ0104 · ₱30,640,172.98
- LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING, LEARNING AND DEVELOPMENT CENTER OF MONCADA), BARANGAY RIZAL, MONCADA, TARLAC21CJ0106 · ₱30,379,648.94 · mapped
- CONST OF FOUR (4) STOREY, TWELVE (12) CLASSROOM SB AT O'DONNELL HS, CAPAS, TARLAC17CK0106 · ₱30,290,393.14
- CONST OF THREE (3) STOREY, TWELVE (12) CLASSROOM SB AT DAPDAP HIGH SCHOOL, BAMBAN, TARLAC17CK0099 · ₱28,032,805.10
- REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG LUCUNG RIVER, (CAFE SECTION, LEFT BANK), CONCEPCION, TARLAC19CK0058 · ₱27,932,326.02 · mapped
- REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG LUCUNG RIVER, (CULATINGAN SECTION, LEFT BANK), STA. 7+150 TO STA. 7+462, CONCEPCION, TARLAC19CK0059 · ₱27,929,891.72 · mapped
- REHABILITATION/IMPROVEMENT OF PARUA RIVER ALONG LILIBANGAN SECTION, CONCEPCION, TARLAC18CK0036 · ₱27,926,860.43 · mapped
- REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG LUCUNG RIVER, RIGHT BANK (CAFE SECTION), CONCEPCION, TARLAC18CK0046 · ₱27,923,009.06 · mapped
- CONSTRUCTION/IMPROVEMENT OF EXISTING DIKE ALONG LUCUNG RIVER (RIGHT BANK, STA. CRUZ SECTION), CONCEPCION, TARLAC18CK0035 · ₱27,911,287.70 · mapped
- REHAB/IMPT OF EXISTING DIKE ALONG RIO CHICO RIVER (MATAYUMTAYUM SECT., RIGHT BANK), LAPAZ, TARLAC18CK0028 · ₱27,889,179.59 · mapped
- REHABILITATION/IMPROVEMENT OF LUCUNG RIVER CONTROL, MALUPA SECTION, CONCEPCION, TARLAC15CK0134 · ₱27,594,240.82
- REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG RIO CHICO RIVER (LA PURISIMA SECTION) R/S, U/S, RIO CHICO BRIDGE, LA PAZ, TARLAC19CK0067 · ₱26,805,666.71 · mapped
- REHAB/IMPT OF EXISTING DIKE ALONG LUCUNG RIVER (SAN JOSE SECT., R/B), D/S OF STA. MARIA BR., CONC.,18CK0029 · ₱23,253,732.45 · mapped
- CONSTRUCTION OF CLASSROOMS: THREE (3) STOREY, NINE CLASSROOM SCHOOL BUILDING AT CRISTO REY HIGH SCHOOL (ORES), CAPAS, TARLAC18CK0132 · ₱23,147,328.13 · mapped
- REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG PARUA RIVER, (SAN VICENTE SECTION) R/S, D/S OF SAN FRANCISCO BRIDGE, CONCEPCION, TARLAC19CK0063 · ₱22,750,355.49 · mapped
- REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG PARUA RIVER, (LILIBANGAN SECTION, LEFT BANK), D/S OF STA. RITA BRIDGE, CONCEPCION, TARLAC19CK0062 · ₱22,137,031.96 · mapped
- REHAB./IMPT. OF EXISTING DIKE ALONG LUCUNG RIVER (BRGY. CAFE SECTION, LEFT BANK),16CK0117 · ₱22,101,806.45
- REHAB/IMPT OF EXISTING DIKE ALONG LUCUNG RIVER, BRGY. STA. CRUZ SECT., LEFT BANK, CONCEPCION, TARLAC16CK0123 · ₱21,942,611.83
- REHAB./IMPT. OF EXISTING DIKE ALONG LUCUNG RIVER (BRGY. CULATINGAN SECTION, LEFT BANK), CONC., TAR.16CK0118 · ₱21,848,776.51
- REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG TAGUSAN CREEK (LEFT AND RIGHT BANK), CONCEPCION, TARLAC19CK0064 · ₱20,448,714.22 · mapped
- CONCRETING OF CORAZON DE JESUS, STO. ROSARIO-STA. MONICA ROAD, CONCEPCION, TARLAC17CK0028 · ₱19,342,074.78
- CONSTRUCTION OF COMILLAS SMALL IMPOUNDING PROJECT (SWIP), LAPAZ, TARLAC17CK0016 · ₱18,615,603.63
- REHAB/IMPT OF EXISTING DIKE ALONG LUCUNG RIVER (SAN JOSE SECT., R/B), D/S OF LUCUNG BR., CONC., TAR.18CK0014 · ₱18,615,521.05 · mapped
- CY-2018 BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH 1-CONSTRUCTION OF 4 STOREY 2 SCIENCE LABORATORY & 2 ICT LABORATORY MIL-AN NATIONAL HIGH SCHOOL18PD0102 · ₱17,685,852.28 · mapped
- CY-2018 BASIC EDUCATIONAL FACILITIES FUND (BEFF) BATCH 1-CONSTRUCTION OF 4 STOREY 1 SCIENCE LABORATORY & 1 REGULAR WORKSHOP, 2 ICT LABORATORY, JOAQUIN SMITH NATIONAL HIGH SCHOOL, BAGUIO CITY18PD0104 · ₱17,640,000.00 · mapped
- CONST OF FOUR (4) STOREY, EIGHT (8) CLASSROOM SB AT LAPAZ NATIONAL HS, LAPAZ, TARLAC17CK0102 · ₱16,767,898.69
- CONSTRUCTION OF TWO (2) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING AT STA. JULIANA HIGH SCHOOL (O'DONNELL HIGH SCHOOL ANNEX), CAPAS, TARLAC17CK0148 · ₱16,630,192.54
- CONSTRUCTION OF CLASSROOMS: TWO (2) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING AT CAPAS WEST CENTRAL ELEMENTARY SCHOOL, CAPAS, TARLAC18CK0134 · ₱16,227,091.07 · mapped
- LIP; CONCRETING OF MONCADA-PANIQUI ROAD, BURGOS SECTION, PANIQUI, TARLAC 1ST LD16CJ0009 · ₱14,578,158.29
- CONSTRUCTION OF THE BUREAU OF LOCAL GOVERNMENT FINANCE, REGIONAL OFFICE III (BLGF, R-III) BUILDING BARANGAY MAIMPIS, CITY OF SAN FERNANDO, PAMPANGA, PROVINCE OF PAMPANGA17C00067 · ₱14,474,505.60 · mapped
- CONSTRUCTION OF 2 STOREY 4 CLASSROOM, CAMPOSANTO ES IN TARLAC18CJ0263 · ₱11,482,163.36 · mapped
- ASSETS PRESERV. OF NATL RD, REHAB/RECONST./UPGRADING OF DAMAGED PAVE NATL RD., BASED ON PMS/HDM-416CK0153 · ₱11,157,005.17 · mapped
- CONST OF VAR. CL IN ELEM, JR & SR H/S: 2 STOREY 8 CL SB AT ANASTACIO G. YUMUL H/S, CONCEPCION,TARLAC16CK0031 · ₱10,240,473.73
- CONSTRUCTION OF MULTI-PURPOSE BUILDING (AGRICULTURAL STORAGE FACILITY), VICTORIA, TARLAC24CJ0261 · ₱9,793,871.06 · mapped
- CONCRETING OF PUROK 1, BRGY. BUENAVISTA FMR, BRGY. BUENAVISTA, PURA, TARLAC18CJ0160 · ₱9,653,919.02 · mapped
- CONSTRUCTION OF 1STY4CL CAMPOSANTO ES, MONCADA, TARLAC20CJ0160 · ₱9,594,550.68 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - REHABILITATION OF CORE ACCESS ROAD, BRGY. CASIPO, SAN CLEMENTE, TARLAC18CJ0073 · ₱9,400,314.46 · mapped
- CONCRETING OF ROAD AT BARANGAY CUT-CUT I, CAPAS, TARLAC17CK0013 · ₱9,308,381.94
- CONSTRUCTION OF CLASSROOMS: TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING AT STA. ROSA INTEGRATED SCHOOL, CONCEPCION, TARLAC18CK0136 · ₱8,503,935.38 · mapped
- CONST OF VAR CL IN ELEM, JR & SR H/S: 2 STOREY, 6 CL AT CALANGITANT H/S (RES. SCHOOL), CAPAS, TARLAC16CK0030 · ₱7,699,351.05
Equipment & capacity
PCAB license
- License no.
- 12655
- Category
- B · Medium A
- Minimum net worth for this category
- ₱10,000,000.00
- Allowable range of contract cost (ARCC)
- up to ₱150M
- License valid until
- Jan 31, 2027
- Checked against PCAB
- Oct 22, 2026
Sources: PCAB license verification (search license 12655); net worth and ARCC from the PCAB Categorization–Classification Table, Board Res. No. 201 s. 2017. These are the minimums for the category, not this firm's actual net worth.
Government performance ratings (CPES)
2 evaluations listed across 1 GPPB CPES release; average final rating 91.8% over 1 rated project; 2 site-visit ratings. The same project can appear in more than one release.
| Evaluated | Agency | Contract amount | Status | Visit | Final | Source |
|---|---|---|---|---|---|---|
| Nov 25, 2019 | DPWH | ₱27,932,326.00 | On-going | 85.5% | — | 40th, p. 44 |
| Jun 17, 2019 | DPWH | ₱6,737,048.00 | Completed | 91.8% | 91.8% | 40th, p. 44 |
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →