Construction of Flood Control Structure along Abra River, Sta. 2+400 - Sta. 3+100, Canan, La Paz, Abra
Construction of Flood Control Structure along Abra River, Sta. 2+400 - Sta. 3+100, Canan, La Paz, Abra is a DPWH-tracked public work in LA PAZ (ABRA), ABRA, Cordillera Administrative Region. Reported contract value: ₱48,997,900.00. Status: Reported complete (DPWH). Contractor on record: ST TIMOTHY CONST CORP. Figures trace to sumbong.
Total Contract Cost



