Construction of Flood Mitigation Structure23FI0003

Construction of Flood Control System along Bangon River, Sta. 0+217.00 - Sta. 0+307.00 (Upstream, Right Side), Sta. 0+244.00 - Sta. 0+307.00 (Upstream, Left Side), Aroroy, Masbate

Construction of Flood Control System along Bangon River, Sta. 0+217.00 - Sta. 0+307.00 (Upstream, Right Side), Sta. 0+244.00 - Sta. 0+307.00 (Upstream, Left Side), Aroroy, Masbate is a DPWH-tracked public work in AROROY (MASBATE), MASBATE, Region V. Reported contract value: ₱24,500,000.00. Status: Reported complete (DPWH). Contractor on record: RED DIAMOND CONST AND SUPPLY CORP FORMERLY: RED DIAMOND CONST. Figures trace to sumbong.

AROROY (MASBATE), MASBATE, Region V
Region: Region V

Money Trail

1. Appropriation

Probable match · score 95%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control System along Bangon River, Sta. 0+000.00 - Sta. 0+067.00 (Downstream, Right Side and Left Side), Sta. 0+244.00 - Sta. 0+337.00 (Upstream, Right and Left Side), Aroroy, Masbate
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Masbate 2nd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱24,500,000.00

Progress

Reported complete (DPWH)

Start Date

May 19, 2023

Target End

November 23, 2023