Flood Control and Drainage25LF0012

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CARAGA RIVER (UPPER SAN PEDRO SECTION), CARAGA, DAVAO ORIENTAL

CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CARAGA RIVER (UPPER SAN PEDRO SECTION), CARAGA, DAVAO ORIENTAL is a DPWH-tracked public work in Davao Oriental 1st DEO, Region XI. Reported contract value: ₱95,047,680.28. Status: Past target date (DPWH On-Going). Contractor on record: C'ZARLES CONST & SUPPLY. Figures trace to dpwh.

Davao Oriental 1st DEO, Region XI
Region: Region XI

Satellite images processing — before/after tiles will appear here after the next batch run.

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control along Boston River San Jose Section, Boston, Davao Oriental
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Davao Oriental 1st DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

59 projects · ₱4.2B total · 5 flags

4. Implementation

Contract Amount

₱95,047,680.28

Progress

Past target date (DPWH On-Going)

Start Date

April 7, 2025

Target End

March 11, 2026

5. Audit