CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION STRUCTURES/ DRAINAGE SYSTEM ALONG CRYSTAL CAVE TO ASIN FLOOD CONTROL, CRYSTAL CAVE TO ASIN, BAGUIO CITY
CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION STRUCTURES/DRAINAGE SYSTEM ALONG CRYSTAL CAVE TO ASIN FLOOD CONTROL, CRYSTAL CAVE TO ASIN, BAGUIO CITY is a DPWH-tracked public work in Baguio City DEO, Cordillera Administrative Region. Reported contract value: ₱46,929,792.19. Status: Reported complete (DPWH). Contractor on record: R S SEPIAN CONST. Figures trace to dpwh.
Total Contract Cost

