Roads16A00005

CONSTRUCTION AND IMPROVEMENT OF ARINGAY-TUBAO ALTERNATE ROAD LEADING TO ASIN HOT SPRING AND BAGUIO

CONSTRUCTION AND IMPROVEMENT OF ARINGAY-TUBAO ALTERNATE ROAD LEADING TO ASIN HOT SPRING AND BAGUIO is a DPWH-tracked public work in Region I, Region I. Reported contract value: ₱142,992,129.27. Status: Reported complete (DPWH). Contractor on record: R S SEPIAN CONST. Figures trace to dpwh.

Region I, Region I
Region: Region I

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16A00005 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2013-04-26 → 2025-02-02

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION AND IMPROVEMENT OF ARINGAY-TUBAO ALTERNATE ROAD LEADING TO ASIN HOT SPRING AND BAGUIO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

100 projects · ₱2.3B total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS RDS LEADING TO AIRPORTS, AND DECLARED TOURISM DESTINATIONS, KINAKIN-CAMBULO ROAD LEADING TO KINAKIN AND CAMBULO NATIVE VILLAGES, RICE TERRACES, BANAO RICE TERRACES, BANAUE IFUGAO

Cordillera Administrative Region, Cordillera Administrative Region

2016₱136.2M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT IMPROVEMENT/WIDENING OF NATIONAL ROADS OUTSIDE N1, MANILA NORTH ROAD, S00186LZ, K0277+(-286) - K0277+394, K0278+250 - K0282+(-138)

Region I, Region I

2016₱123.0M
Reported complete (DPWH)
No sat.

RD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL RD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED RD STDS (HDM-4 PROJ ANALYSIS) LUBUAGAN-BATONG BUHAY - ABRA BDRY ROAD, K0462+032-K0464+536, LUBUAGAN, KALINGA

Cordillera Administrative Region, Cordillera Administrative Region

2016₱93.2M
Reported complete (DPWH)

CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG STA. MARIA RIVER (TUMANA SECTION), STA. MARIA, BULACAN

Bulacan 2nd DEO, Region III

2018₱87.3M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT SYSTEM-4 (HDM-4) (INTERMITTENT SECTIONS), ILOCOS SUR-ABRA RD (S00162LZ), K0378+(-155) - K0379

Region I, Region I

2016₱81.7M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT- IMPROVEMENT/WIDENING OF NATIONAL ROADS, ABRA-KALINGA ROAD, KO421+600 - KO425+000

Abra DEO, Cordillera Administrative Region

2017₱69.5M
Reported complete (DPWH)
View all 100 projects →

4. Implementation

Contract Amount

₱142,992,129.27

Progress

Reported complete (DPWH)

Start Date

February 23, 2016

Target End

December 18, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.