CLUSTER 9 - CONSTRUCTION MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM A. CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG SAGUMAYON RIVER, BAGUMBAYAN, DARAGA, ALBAY B. CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG PAWA RIVER, PAWA, LEGAZPI
CLUSTER 9 - CONSTRUCTION MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM A. CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG SAGUMAYON RIVER, BAGUMBAYAN, DARAGA, ALBAY B. CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG PAWA RIVER, PAWA, LEGAZPI is a DPWH-tracked public work in Albay 2nd DEO, Region V. Reported contract value: ₱18,600,475.10. Status: Reported complete (DPWH). Contractor on record: SUNWEST INC FORMERLY: SUNWEST CONST. Figures trace to dpwh.
Satellite images processing — before/after tiles will appear here after the next batch run.
Total Contract Cost

