Construction of Flood Mitigation Structure23CJ0062

Construction of Slope Protection with Steel Sheet Pile Foundation Along O'Donnell River Control Right Dike, Armenia to San Jose De Urquico Section (Package D), Barangays Armenia to San Jose De Urquico, Tarlac City, Tarlac

Construction of Slope Protection with Steel Sheet Pile Foundation Along O'Donnell River Control Right Dike, Armenia to San Jose De Urquico Section (Package D), Barangays Armenia to San Jose De Urquico, Tarlac City, Tarlac is a DPWH-tracked public work in CITY OF TARLAC (CAPITAL) (TARLAC), TARLAC, Region III. Reported contract value: ₱65,522,147.96. Status: Reported complete (DPWH). Contractor on record: FLORDES CONST & TRADING CORP FORMERLY FLO. Figures trace to sumbong.

CITY OF TARLAC (CAPITAL) (TARLAC), TARLAC, Region III
Region: Region III

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱35,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Cubcub, Mayantoc, Tarlac
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Tarlac District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

4. Implementation

Contract Amount

₱65,522,147.96

Progress

Reported complete (DPWH)

Start Date

March 23, 2023

Target End

October 14, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.